125 Shaftesbury Avenue, London

125 Shaftesbury Avenue, London

Client: CBRE Managed Services

Background: The original client brief was to investigate water ingress issues that had been plaguing the building for some time.

Scope Of Service: Investigations leading to full design & refurbishment of the top inverted roof area with a cold applied liquid waterproofing system with a 20 year guarantee.

Form Of Contract: Purchasing Contract

The tenant of the building at the time were Facebook, so the amount of personnel and computer equipment in the building was vast, creating a high risk to the operation of the business. It was discovered that the inverted roof system was installed over an old asphalt system which had come to the end of its serviceable life.

The decision was made by the client to take the opportunity to install a cold applied liquid waterproofing system to the entire area. This would give the roof a new 20 year guarantee alongside peace of mind that the tenants equipment would remain safe from damage and the building fabric would not be damaged any further.

The works were phased in to 2 sections due to the vast amount of stone on the roof, meaning it had to be transferred to each side to accommodate the install. Due to the logistical constraints of the project, the waste had to be disposed of immediately via waiting loads.

Equally materials being delivered had to be done on a ‘just in time’ style of working. This forced a robust and strict programme with key milestones that could not be missed.

Related case studies

We were invited to participate in this project at a very early preconstruction stage, this enabled us to work closely with the client’s design team to ensure the developing proposal suited the client’s requirements as well as met all standard compliance criteria. TSL’s industry known ability to work with minimal disruption was heavily leaned on […]

The client brief consisted of an entire facial uplift to the main entrance & external facade of the hotel, to be completed alongside the internal refurbishment of this wing of the building. An important part of this scheme was being involved with the clients design team from the start, this enabled us to work with […]

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels. The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired […]

Latest News

Welcome to the team Bradley Plummer!

Welcome to the team! Project Manager – Bradley Plummer We’re thrilled to have Bradley onboard, he’s a great fit and …

Read More >
Luke Conlane TSL New Starter

Welcome to the team Luke Conlane!

Welcome to the team! Trainee Site Manager – Luke Conlane Luke joins TSL with a vast amount of practical experience …

Read More >

TSL went to the races!

The long-anticipated TSL team day out was everything we could have wished for and more. Our partners at Southern Scaffolding …

Read More >