Tapestry Building, Kings Cross

Tapestry Building, Kings Cross

Client: Kier Group

Background: Kier provides a comprehensive building and civil engineering service offering construction excellence to private and public sector clients across the UK and overseas.

Scope Of Service: Full bitumen hot melt system build up with 20-year guarantee, incorporated green roof & sedum blankets on lower levels with brown roof on higher levels.

Form Of Contract: JCT Design & Build

Contract On Site: 20 weeks

This section of the prestigious Kings Cross development was sent out to competitive tender via Kier Group, the contractor responsible for delivering the construction of the building. With the building being of such a high profile in an important part of the capitals development it was a project we strived to be a part of. After a fair and resilient tender process TSL were awarded the contract to undertake the waterproofing of the balconies, winter gardens, communal gardens, and main roof areas with integrated green and brown roofs.

 

This project required a complex execution plan due to the programme constraints and interfacing of preceding and succeeding trades, while adhering to strict measures. Due to the project being carried out in close proximity to the Kings Cross station. The project progressed through its various stages of waterproofing allowing other aspects of the building to be constructed and waterproofed whilst still maintaining continuity of progress for all trades.

 

Additional works were added throughout the project; such as the building maintenance units drive track on the 10th floor green roofs, which was carefully designed in such a way to not affect the PV system and the green roof finishing layer.

 

The project and developer aimed to keep the work as environmentally appealing as possible, habitats were installed on the green roofs to encourage the nesting of Black Redstarts as these are a common bird in the area. The insect hibernaculum’s have allowed the bio diverse green roofs to act in the same manner as ground floor habitats with sand/rock mounds and log piles to encourage further insects. This was undertaken in line with design guidelines for biodiverse green roofs and aids in sustainability of new build developments, will be maintained for a set period of time to ensure that the highest possible growth and quality is maintained.

Related case studies

We were invited to participate in this project at a very early preconstruction stage, this enabled us to work closely with the client’s design team to ensure the developing proposal suited the client’s requirements as well as met all standard compliance criteria. TSL’s industry known ability to work with minimal disruption was heavily leaned on […]

The client brief consisted of an entire facial uplift to the main entrance & external facade of the hotel, to be completed alongside the internal refurbishment of this wing of the building. An important part of this scheme was being involved with the clients design team from the start, this enabled us to work with […]

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels. The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired […]

Latest News

Antony Knight Project Manager

Employee Spotlight – Antony Knight

Antony celebrates his six-year anniversary this month so we felt there’s no better person to ask about what it’s like …

Read More >

Meon Milton on the Move

Great to see Meon Milton FC under 7’s in their new TSL kit, they’ve made a strong start and we …

Read More >

Employee Spotlight – Lily Sait

Lily celebrates her one year anniversary with TSL this month so we’ve taken some time to learn more about her …

Read More >