Jennens Court

Cladding Remediation Jennens Court, 250 Jennens Rd, Birmingham B5 5JR

We were invited to participate in this project at a very early preconstruction stage, this enabled us to work closely with the client’s design team to ensure the developing proposal suited the client’s requirements as well as met all standard compliance criteria. TSL’s industry known ability to work with minimal disruption was heavily leaned on […]

Raddison Red, Heathrow

The client brief consisted of an entire facial uplift to the main entrance & external facade of the hotel, to be completed alongside the internal refurbishment of this wing of the building. An important part of this scheme was being involved with the clients design team from the start, this enabled us to work with […]

Double Tree By Hilton, Docklands

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels. The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired […]

Waverley House, Bristol

After the tragic events of Grenfell Tower, London; a review of cladding materials currently installed on buildings was initiated. Waverly House was found to have a non-compliant cladding panel installed and as a matter of urgency, TSL was mobilised almost immediately to remove the panels and temporarily cover the building with compliant finishes, until a […]

British American Tobacco: Building 23, Southampton

TSL received the invitation to tender for this opportunity on behalf of a facilities management company, which we have a flourishing relationship with. Repeatedly we have demonstrated our services are the best solution for their client’s requirements. We continually fulfill and exceed these requirements ensuring that the involvement of the FM company is as stress […]

Asset Condition Surveys

The building exterior represent a significant portion of overall facility investment. While the overall facility appreciates in value, the roof and  building exterior assets depreciate over their designed service life.   Roof and envelope systems can  deteriorate from normal wear, severe weather conditions, building movement, improper design, construction and others. Properties should not deteriorate through neglected […]

Student Accommodation, Bristol

Storm Doris caused major disruption across the UK, Scotland and Wales during February 2017, rain, snow and gales of up to 90 mph were reported. TSL were contacted and as a matter of emergency operatives attended a student accommodation building in Bristol, immediately. It had been reported a cladding panel had detached from the side […]